麻花传剧原创MV九九九,可以进入任何网站的浏览器,女儿借爸爸种生孩子,香港三级巜欲性高蜜桃成熟时类似

5 Steps of the FM Approvals Certification Process

TESTCOO/April 12, 2022

No matter the product or the complexity of the test program, we will work with you to evaluate your product against the highest level of testing standards to earn the FM APPROVED mark. The Approval process is efficient and helps differentiate your product in the marketplace.

STEP 1
Manufacturer Request

The manufacturer submits a letter, fax or email to FM Approvals, requesting Approval for a product or assembly and provides the location, scope of work, model numbers, specifications and applicable sales literature. Customers seeking Approval of new products should fill out our application form to request a quote.

STEP 2
Proposal Issue and Manufacturer Authorization

FM Approvals sends a proposal letter to the customer with the scope of work, cost estimates, schedule, required tests and sample needs. For new customers, a one-time contractual agreement is also mailed for signature (Master Agreement). The manufacturer then authorizes the proposal in writing and submits all requested material and information identified in the proposal.

STEP 3
Review, Testing and First Audit

FM Approvals makes drawing or specification to product comparisons. If all necessary items are received, testing is scheduled and conducted. The investigator visits the customer’s facility (if first-time customer or new manufacturing location) to review quality control procedures prior to product Approval by FM Approvals.

STEP 4
Report, FM APPROVED Mark and Listing

Once testing has been completed successfully, a report is prepared and reviewed for technical accuracy and quality. Samples are retained and archived as necessary, returned to the customer or disposed of per the customer’s instructions. FM Approvals sends the final report to the manufacturer. Approval is effective as of the date of report. The manufacturer may then label the product as FM Approved, and the product is listed in the Approval Guide, an online resource of FM Approvals. FM Approved roofing assemblies are entered into RoofNav, our web-based software.

STEP 5
Surveillance Audits

Surveillance audits of manufacturing facilities are required in order to maintain FM Approved status.

Free Sample Report Performance Quality Control

Download a sample report to keep control of your supply chain!

成全高清免费完整观看| 成都私人情侣免费看电视剧的软件| 三男一女免费播放电视剧大全| 国外成品网站1688入口在哪| 黑料门今日黑料免费| 公车上双乳被两男人夹击电影| 7777影院免费观看电视剧大全| 国产在线观看免费全集电视剧网站| 《性旺盛的女人》HD| 美女和男生一起努力的生孩子视频.. | 《不戴套瑜伽教练3》| 小洞流口水了 是不是饿了| 吻戏高潮| 韩浸在线阅读浸画画免费读漫画下.. | 马配人能配进去吗| 成品网站1688入门怎么样| 女朋友想放进去睡是什么心理| 狗和女人戴避孕套会传染吗| 少女配狗播放视频| 《炸梨吧!巨棒》免费阅读漫画| 免费观看已满十八岁的电视剧大全| 电视剧在线观看免费| 第9节 妈妈女儿齐上阵| 992TV| 精品人OR猪OR狗的DNA| 《部长你别这样》大结局| 美丽小洞5荷尔蒙| 女生给男生吃小头头| 舌头底下舔着有小硬疙瘩视频| 《朋友的未婚妻》| 韩漫免费观看在线阅读漫画| 被灌满精子的女人会得白血病吗 | 成全在线观看免费完整的 | 晚上打扑克视频| 《插曲的痛免费观看第二季》 | 甜蜜惩罚~我是看守专用宠物| 《男医生的特殊治疗》| 5人轮换免费观看电视剧最新| CSGO暴躁少女高清大片| 蜜汁樱桃》笔趣阁全文免费阅读| 《出差的日子》中文版